Supertech ORB noida
Supertech residential project Supertech ORB noida located at Sector 74. Supertech ORB noida offers 3BHK, 4BHK apartments. Supertech ORB noida is among the Ongoing Projects of Supertech Limited. The landscape in Supertech ORB noida is beautiful with spacious Houses. Supertech ORB noida Project has various modern amenities like Swimming Pool, Play Area, 24Hr Backup, Security, Club House, Cafeteria, Tennis Court, Gymnasium etc.
Supertech ORB sector 74 noida
Specification
Structure | RCC Framed earthquake resistant Structure with Supertech ORB noida price. |
Wall Finish | |
Internal | All internal walls in cement plaster with plastic emulsion paint with POP punning or texture finish/paneling/wall paper in Supertech ORB sector 74 noida |
Externals | External walls in texture paint & structural glazing as per design.Plantation in common areas with proper lighting with Supertech ORB noida price |
Living, Dinning | Italian / Indian Stone with designer patterns in Supertech ORB sector 74 noida |
Master Bed room | Italian / Indian Stone with designer patterns / High grade Wooden Flooring with Supertech ORB noida price. |
Teenager Room | Vitrified Tiles in Supertech ORB sector 74 noida |
Other Bed Rooms | Vitrified Tiles / Imported Wooden Flooring |
Servant Room | Vitrified Tiles with Supertech ORB noida price. |
Kitchen | Vitrified Tiles in Supertech ORB sector 74 noida. |
Toilets | Anti Skid Ceramic Tiles with Supertech ORB noida price |
Lobby of Buildings | Indian Stone / Vitrified Designer Tiles in Supertech ORB sector 74 noida |
Kitchen | Walls shall feature high quality ceramic tiles & counter shall be of granite stone. Double bowl stainless steel sink. Modular Kitchen R.O.System with Supertech ORB noida price |
Dado | Ceramic tiles upto 2 ft. above counter level in Supertech ORB sector 74 noida. |
Doors | Seasoned hardwood frame with European style moulded shutter with Supertech ORB noida price |
Toilets | Walls with imported ceramic tiles up to false ceiling. W.C. and wash basin in matching shades Hindware / Cera or equivalent .Single lever C.P. Fittings Jaquar or equivalent. Jacuzzi in Master Bath. Would include exhaust fan / mirror with Supertech ORB noida price. |
Plumbing | CPVC piping for water supply inside the toilet and kitchen & UPVC pipes for stacks in Supertech ORB sector 74 noida. |
Electricals | Modular switches of LEGRAND or equivalent make and copper wiring , Lights in all rooms , Kitchen , Toilets , Balconies and Passages with Supertech ORB noida price |
Power back up | 100% DG power back-up for all the apartments and common areas in Supertech ORB sector 74 noida. |
Communication | TV and telephone points, Video door phone, internet |
Lobby | High Speed passenger Elevators with Supertech ORB noida price |
Security | Secured gated community with access control at entrances and CCTV for parking area and Entrance lobby at ground floor in Supertech ORB sector 74 noida. |
Supertech ORB noida price
1 |
At the time of booking |
10% |
|||||
2 |
Withing 30 days from Booking |
85% |
(Lease Rent+EDC+PLC) |
||||
3 |
On offer of possession letter |
5% |
(IFMS+Club Membership+Car Parking+Others Charges |
||||
Flexi Payment Plan ‘B’ |
|||||||
S. No. |
Particulars |
% |
Others Charges |
Special Payment Plan ‘D’ |
|||
1 |
At the time of booking |
10% |
S. No. |
Particulars |
% |
||
2 |
Withing 60 days from Booking |
30% |
1 |
At the time of booking |
40% |
||
3 |
On start of foundation work |
10% |
2 |
On start of 25th floor roof slab |
20% |
||
4 |
On start of 5th floor roof slab |
5% |
3 |
On start of 40th floor roof slab |
20% |
||
5 |
On start of 10th floor roof slab |
5% |
4 |
On offer of possession letter |
20% |
||
6 |
On start of 15th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
||||
7 |
On start of 20th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
||||
8 |
On start of 25th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
||||
9 |
On start of 30th floor roof slab |
5% |
25% of (EDC+Lease Rent+PLC) |
||||
10 |
On start of 35th floor roof slab |
5% |
25% of (PLC) |
SUBVENTION PAYMENT PLAN ‘E’ |
|||
11 |
On start of 37th floor roof slab |
5% |
25% of (PLC) |
S. No. |
Particulars |
% |
|
12 |
On start of super structure |
5% |
25% of (PLC) |
1 |
At the time of booking |
15% |
|
13 |
On offer of possession letter |
5% |
IFMS+Club Membership+Car Parking+Others Chages |
2 |
After bank funding |
80% |
|
3 |
On offer of possession letter |
5% |
Supertech ORB Noida Payment Plan
1 |
At the time of booking |
10% |
|
2 |
Withing 45 days from Booking |
10% |
|
3 |
On start of foundation work |
5% |
|
4 |
On start of 2nd floor roof slab |
5% |
|
5 |
On start of 5th floor roof slab |
5% |
|
6 |
On start of 10th floor roof slab |
5% |
|
7 |
On start of 15th floor roof slab |
5% |
|
8 |
On start of 20th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
9 |
On start of 25th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
10 |
On start of 30th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
11 |
On start of 35th floor roof slab |
5% |
25% of (EDC+Lease Rent) |
12 |
On start of 37th floor roof slab |
5% |
25% of (PLC) |
13 |
On start of 40th floor roof slab |
5% |
25% of (PLC) |
14 |
On start of 43rd floor roof slab |
5% |
25% of (PLC) |
15 |
On start of super structure |
5% |
25% of (PLC) |
16 |
On start of internal plastering |
5% |
|
17 |
On start of External Plastering |
5% |
|
18 |
On offer of possession letter |
5% |
IFMS+Club Membership |
Supertech ORB Noida Floor Plan
Supertech ORB Noida Site Plan
Supertech ORB Noida Location Map